Operation Manual D-480 ©BÜCH Labortechnik AG
8 - Maintaining the instrument 199
Furnace area
The following picture shows the details of the furnace area:
Legend:
1 Ground-in clamp
3 Ball valve fastening
Phase 3: Removing the ball valve
Proceed as follows:
Open the ground-in ball-and-socket joints of the tube (1) leading to the ball valve.
Push the right side door open from inside (magnetic lock).
From the right, unscrew the ball valve (3) locking screws using an 8mm open jawed wrench.
Pull the ball valve out of the instrument to the front.
Dismantled ball valve
The following picture shows the disassembled ball valve:
Legend:
1 Wheel flange of the half shells
2 Top and bottom half shell
3 Ball
4 Screws
5 Drive bearing
6 Holder plate
7 O-ring
8 Bayonet catch
Comments to this Manuals