Operation Manual D-480 ©BÜCH Labortechnik AG
8 - Maintaining the instrument 230
Top view furnace
The following picture shows a top view of the furnace pulled out:
Legend:
1 Post combustion tube plug
2 Post combustion tube
3 Combustion tube connection
4 Combustion tube
5 Reduction tube plug
6 Reduction tube
Phase 1: Installing reaction tubes
Proceed as follows:
Close the reduction tube (6) with the plug (5).
Close the combustion tube (4) with the combustion tube connector (3).
Close the post combustion tube (2) with the plug (1).
Insert the reaction tubes into the furnace:
Insert the combustion tube (4) in the middle, as seen from the front; the combustion tube
fixing pin (5) must snap into the holder (6).
Insert the reduction tube (6) on the right, as seen from the front.
Insert the post combustion tube (2) on the left, as seen from the front.
Check that the reaction tube comes to rest on the bottom of the holder. The holders are
height-adjustable so as to allow for reaction tube length tolerances.
Install the quartz glass bridge between the combustion tube outlet and the post combustion tube
inlet.
Comments to this Manuals