Operation Manual D-480 ©BÜCH Labortechnik AG
8 - Maintaining the instrument 210
Place the ungreased seal on the combustion tube connection (3) at the top.
Furnace area
The following picture shows the details of the furnace area:
Legend:
1 Handle
2 Bayonet catch
3 Reduction tube connection
4 Post combustion tube connection
Phase 2: Installing the Ni flap (continued)
Proceed as follows:
Push the furnace back:
Lift the bayonet catch (2) slightly so as not to damage the seal on the combustion tube
connection.
Close the bayonet catch by turning the bayonet catch handle (1) to the left.
Close the ground-in clamp (3) on the reduction tube.
Connect the post combustion tube (4) with the two ground-in clamps again.
Connect the O
2
supply tube with a ground-in clamp.
Close the front door.
Step 3:Follow-up instrument preparation, gas pressure / gas-tightness
After completing all maintenance work, put the instrument back into a state ready for measurement.
See "Follow-up preparation of the instrument: Gas pressure / tightness" in Preparing and following
up maintenance work (on page 171).
To be observed after maintenance
If you have performed maintenance work that has a defined maintenance interval, you must manually
reset the "Status" field to zero on the "Maintenance intervals" dialog (accessible via Options >
Maintenance > Intervals. See Defining maintenance intervals in the software (on page 170).
Removing, cleaning and re-installing the O2 lance
Note
The following section describes the maintenance of the O
2
lance.
Comments to this Manuals