Buchi Rotavapo R-220 SE User Manual Page 59

  • Download
  • Add to my manuals
  • Print
  • Page
    / 109
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 58
5 Putting into operation
59 R-220 SE Operation Manual, Version F
a
Level drain with Ø 12 mm hose connector, let into sink.
b
Draining tap with Ø 12 mm hose connector, let into sink.
c
Heating and cooling water source. If a water tap is used, the optional cooling water shut-off tap is recom-
mended.
d
Control cable to cooling water valve connection at the Rotavapor connection panel (rear side).
e
Routing of the cooling water supply tube:
Route the tube through the free tube holes at the bath lift side plates, make sure the tube can not be
kinked or damaged by the lift mechanic!
Connect the tube to the replenishment needle valve tap. Use a hose clamp to safely install the tube.
5.15.2 Heating transfer media with high boiling point
The use of commercially available, nontoxic medium is highly recommended. However, all supple-
mentary data sheets of the used liquids must be obtained!
Screw cap ½" (order no. 11055682)
When using liquids with high boiling points the replenishment tap must not (!) be connected to a
water source for safety reasons.
The level drain must be closed with the original screw cap.
The filling level should be a fingerbreadth below the level drain output with the evaporating flask
immersed.
NOTICE
Risk of damage caused by heating transfer mediums.
Do not fill the heating bath to overflow
Seal drain with screw cap
NOTE
Use PTFE seal tape for a tight installation of the screw cap!
Page view 58
1 ... 58 59 60 ... 109

Comments to this Manuals

No comments