Buchi Rotavapo R-220 SE User Manual Page 85

  • Download
  • Add to my manuals
  • Print
  • Page
    / 109
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 84
9 Shutdown, storage, transport and disposal
85 R-220 SE Operation Manual, Version F
9 Shutdown, storage, transport and disposal
This chapter instructs how to shut down and disposal of the instrument. Information about storage
and shipping conditions can also be found here.
9.1 Storage and transport
Switch off the instrument and remove the power cord. To disassemble the Rotavapor follow the
installation instructions in section 5 in reverse order. Remove all liquids and other residues before
packging the instrument.
NOTE
It is recommended to ship the instrument and its accessories in original packing to reduce the risk of
possible transport damages.
!
WARNING
Death or serious poisoning by contact or incorporation of harmful substances.
Wear safety goggles
Wear safety gloves
Wear a suitable protective mask
Wear a laboratory coat
Clean the instrument and all accessories thoroughly to remove possibly dangerous substances
Do not clean dusty parts with compressed air
Store the instrument and its accessories at a dry place in its original packaging
!
CAUTION
Risk of minor or moderate injury by heavy weight of the instrument.
Consult a second person to transport the instrument
Do not drop the instrument
Place the instrument on a stable, even and vibration-free surface
Keep limbs out of crushing zone
Page view 84
1 ... 84 85 86 ... 109

Comments to this Manuals

No comments