5 Putting into operation
67 R-220 SE Operation Manual, Version F
5.21 Controller upgrade
To upgrade a basic Rotavapor with a controller proceed as follows:
c
d
b
a
e
a
Remove the two thumb nuts and take off the retaining plate.
b
Replace the dummy controller box with a controller.
c
Remove the blind plug.
d
Take the free end of the controller cable out off the housing. Shift in the cable bushing of the
controller cable as replacement for the blind plug.
e
Install the controller (see previous section for more information).
5.22 Final installation check
After installation has been completed and before performing the first distillation make sure the installa-
tion has been carried out correctly:
Inspect glassware visually for possible damage
Inspect safe and correct routing of all cables and hoses
Check that all connections (steam, water, vacuum) have been fixed properly
Check all supply hoses for tightness
If applicable: Check overall system vacuum tightness
Switch on the vacuum source
Check if desired vacuum operation level can be reached